IBIS Quality Teleconference April 22, 2003 TIME AND PHONE FOR NEXT MEETING May 6, 2003 9-10 AM EST (6-7 AM PST) Phone: 408-974-8478 or 800-249-5618 Meeting access: CONFERENCE SERVER 1, Conference ID: 54644 ROLL CALL Adam Tambone adamt@maine.rr.com *Barry Katz bkatz@sisoft.com Benjamin P Silva benjamin.p.silva@intel.com *Bob Ross bob@teraspeed.com *Brian Arsenault arsenault_brian@emc.com Eckhard Lenski Eckhard.Lenski@siemens.com Eric Brock ebrock@sisoft.com Gregory R Edlund gedlund@us.ibm.com Hazem Hegazy hazem_hegazy@mentorg.com John Figueroa jfigueroa@apple.com *Katja Koller Katja.Koller@siemens.com Kevin Fisher kfisher@sisoft.com *Kim Helliwell kimgh@apple.com Lance Wang lwang@cadence.com Lynne Green lgreen@cadence.com Mike Labonte milabont@cisco.com Peter LaFlamme plaflamm@amcc.com *Robert Haller rhaller@sisoft.com Roy Leventhal Roy_Leventhal@3com.com Sherif Hammad sherif_hammad@mentorg.com Todd Westerhoff twesterh@cisco.com Tom Dagostino tom@teraspeed.com *Kazuyoshi Shoji kshohji@hitachi-ul.co.jp *Sadahiro Nonoyama nonoyama@hitachi-ul.co.jp Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Barry Katz chaired the meeting. - Review of minutes for April 8, 2003 Minutes approved with no changes - Announcements EIA Call for Patent Disclosure No company declared a patent. Tentatively IBIS summit at DesignCon East June 23rd 2003, Location Marlboro MA - AR Review AR - Barry and Bob update and post component section.- DONE AR - Kim to obtain range of Ccomp values IBIS parser checks.- DONE Parser issues a warning if outside range 0-1000pf - Opens for new items We expect to have draft documentation complete and compiled into one document for DAC (JUNE). Barry will present IBIS Quality Committee update at the DAC IBIS Open Forum. - Detailed Documentation review The latest component_section.txt (IQ_3_0_model_section.txt) was uploaded to the web site. Barry continued to walk us through the Model_section document (IQ_4_0_model_section.txt). It is requested the responsible author be present at phone calls to walk the group through the documentation. Temperature and voltage descriptions look good, Minor editorial changes. Removed External reference section. This has never been seen/used by anyone on the team. The model section document has a number of updates that need to be made including ramp sentence removed. Mike covered this in waveform processing. Timing reference load information is missing. [Cref,Rref, Vref, Vmeas] AR - Bob Haller to insert relevant information from Timing reference load Parser Bug submitted to open forum by IQ Committee into Model_section document. AR - Barry to contact Mike Labonte to inform him to attend in two weeks to help review Waveform processing document. This Waveform processing [Model Spec] document should be moved directly after the Model_section [Model] Bob walked the team through the IV_Curve document (IQ_4_3_iv_curve.txt). Need to Add levels and Keywords. Numerous editorial changes. Proceeded up to Pullup curves. Discussion on what to do if a model has excessive currents. Deferred this discussion. AR - Look at minutes to review previous IV curve checks for level 0. AR - Bob Ross to dig up Table of legal IV curve combinations (from old parser bug). AR - Bob Haller update and post IV curve document. - Plans for next meeting Continue review of IV_Curves document On deck - review of ramp_and_waveproc.doc - Schedule for next meeting May 6, 2003 9-10 AM EST (6-7 AM PST) Phone: 408-974-8478 or 800-249-5618 Meeting access: CONFERENCE SERVER 1, Conference ID: 54644 Meeting ended at 10:00 AM Eastern Time. -------------------------------------- Robert J. Haller (rhaller@sisoft.com) Principal Consultant Signal Integrity Software Inc. 6 Clock Tower Place, Suite 250 Maynard, MA 01754 Phone: (978) 461-0449, ext 15